W6 ServersLevel 2/8Legendary2026Done

The 19-minute move

AWS to Contabo, October 2026

Moved the company’s entire 71-service production box to a new provider with 19 minutes of downtime, after checking every database byte for byte.

The 19-minute move: The move in numbers
The move in numbers

The story

Everything moved in one day: CapRover with every app, GitLab, Nextcloud, mail, the Supabase stack and every database. The outage ran from 11:50 to 12:09 UTC against a plan of 45 to 60 minutes, and clients on stale DNS still reached the new box through forwarding.

Hard parts cleared

  • Nothing could be sent twice: during the rehearsal the new box ran with outbound traffic blocked, so cloned apps could not send mail, pushes or webhooks.
  • 69 images and 59 volumes moved byte for byte, datacenter to datacenter, with a warm sync first and a final one after a clean stop.
  • A drift check compared every service spec old against new and came back clean; 21 database volumes were checksum-verified.
  • Cutover without waiting for DNS: the old box forwarded every port except SSH to the new one, so the outage ended when forwarding began.

More from Servers

Continue?

If you have a system to build, a game to make or a server that needs moving, I am one message away.

info@al-arcade.com